Building Codes Department
Commercial/Industrial Submittal Requirements



Adopted Code:

  • 2009 Edition as Amended
  • International Building Code
  • International Residential Code
  • International Mechanical Code
  • International Fuel Gas Code
  • International Fire Code
  • International Plumbing Code
  • International Property
  • Maintenance Code
  • National Electrical Code 2008 Edition

Design Criteria:

  • Wind, 90mph Exposure C @ 3 second gust
  • Seismic, Zone 2A
  • Snow, 20 PSF
  • Roof Classification, Min. Class C Fire Rated
  • Flood Plain Info, Base Flood Elevation

Design Submittal:

  • Professional Stamp: Each set signed and dated.
  • Architect/Engineer must certify that plans meet design criteria.
  • Two sets of construction plans for review per building.
  • 3 Site Plans
  • Special Inspections May Be Required For Concrete, Masonry, Soils, etc.
  • Complete list of contractors and subcontractors. All contractors and subcontractors shall be licensed with the City of Bonner Springs.
  • Rapid Key Entry System (Knox Box) is required on all commercial and industrial occupancies.
  • This department will provide a stamped approved set of plans to be kept on job site.

Note: Plans submitted to the Planning Department are not forwarded to the Building Department – A separate submittal is required..

Permit Processing Goals:

The Codes Department will try to meet the following timetable:

  • Review Commercial or Industrial Set of Plans within 7-10 days.
  • A permit cannot be issued until the Governing Body has approved all Planning documents and Public Improvements for Commercial or Industrial projects.